Wine Solutions Bottling plant Cromwell
May Plumbing & Gas was engaged by the owners of a new wine bottling factory to carry out the water supply and hot water systems.
We designed and specified the systems which resulted in a new larger water main connection being installed, and council and private supply backflow prevention systems installed.
A large commercial water softening system, then reticulation of services throughout the factory was completed.
A commercial gas hot water system and LPG compound were also installed to enable sterilising hot water supply.
This project was designed & built by the team at May Plumbing & Gas.